Title |
Responsibility |
Owner / Location |
Completion |
|
Design Engineering
Diablo Canyon Power Plant |
Provide electrical
design engineering services |
Pacific Gas &
Electric Co. - DCPP
Avila Beach, CA |
12/06 |
|
Diablo Canyon
ISFSI project |
Provided design
engineering services |
Pacific Gas &
Electric Co. - DCPP
Avila Beach, CA |
Est 12/06 |
|
Diablo Canyon
Reactor Head Replacement Project |
Provided design
engineering and licensing submittal support |
Pacific Gas &
Electric Co. - DCPP
Avila Beach, CA |
Est 12/08 |
|
Diablo Canyon
ISFSI project |
Provided project
scheduling services |
Pacific Gas &
Electric Co. - DCPP
Avila Beach, CA |
Est 12/06 |
|
Design Engineering
Diablo Canyon Power Plant |
Provided design
engineering support for project work including RPE and heavy loads
program. |
Pacific Gas &
Electric Co. - DCPP
Avila Beach, CA |
7/05 |
|
Transmission and
Distribution Design Services |
Provided support
services for T & D engineering group. |
Sacramento
Municipal Utility District
Sacramento, CA |
Est 12/06 |
|
Pole Replacement
Project |
Provided all
assessment and replacement packaging services including mapping in
LD PRO |
Sacramento
Municipal Utility District
Sacramento, CA |
Est 12/06 |
|
Construction
Management for Consumes Power Plant |
Performed environmental studies for
gas line extension |
Sacramento
Municipal Utility District
Sacramento, CA |
Est. 6/06 |
|
Construction
Management for Consumes Power Plant |
Geotechnical
services for gas line and power plant |
Sacramento
Municipal Utility District
Sacramento, CA |
Est. 6/06 |
|
Construction
Management for Consumes Power Plant |
Provided Safety
Manager for project |
Sacramento
Municipal Utility District
Sacramento, CA |
Est. 6/04 |
|
Construction
Management for Consumes Power Plant |
Gas line
inspection CBO and metering station design services |
Sacramento
Municipal Utility District
Sacramento, CA |
Est. 6/06 |
|
Procurement
Request Preparation |
Work with plant
engineers to define work scope and Draft Requests for Proposals for
electrical consulting work necessary to go to bid (by others) and
produce Contract Work Authorizations. |
Pacific Gas &
Electric Co. - DCPP
Avila Beach, CA |
8/00 |
|
Transmission &
Distribution Substation Design |
Staff Augmentation
- support switchyard remote operation and capacity upgrades. |
Sacramento
Municipal Utility District
Sacramento, CA |
12/03 |
|
Nuclear Licensing
& Regulatory Support |
DCPP / HBPP Dry
Cask Storage (ISFSI) Licensing support.
General licensing support. |
Pacific Gas &
Electric Co.- DCPP
Avila Beach, CA &
San Ramon, CA |
12/08 |
|
SMUD – Electrical Distribution Engineering |
Provided Staff Augmentation support for design
changes and capacity modifications for Electrical Distribution
Engineering and Design, and Protection Engineering and Mappers |
Sacramento Municipal Utility District
Sacramento, CA. |
12/02 |
|
Humboldt Bay
Technical Specification |
Rewrote Technical
Specifications for a defueled nuclear power plant |
Pacific Gas &
Electric Co.
Humboldt Bay, CA.
|
06/01 |
|
Auditing and
Training |
Provided auditing
and training support for Electrical Distribution Group |
Pacific Gas &
Electric Co.
San Francisco, CA |
6/00 |
|
Humboldt Bay
Explosives Analysis |
Provide analysis of
requirements for performing the licensing of a Dry Cask Storage
Facility |
Pacific Gas &
Electric Co.
Humboldt Bay, CA. |
3/00 |
|
Electrical design
for two new 96 KVA gas co-generator units.
|
Design retrofit and
re-power 150MW co-generation plant and design 2 new 96 KVA gas
co-generator units. |
Kansas City Power
And Light-Electrical Utility |
5/00 |
|
Licensing Support
for Diablo Canyon Power Plant |
General licensing
services for operation, up-rating and license renewal |
Pacific Gas and
Electric Co.
Avila Beach, CA |
12/04 |
|
System Protection
& Control |
Staff Augmentation
- Electrical System Protection Engineer. |
Sacramento
Municipal Utility District
Sacramento, CA |
12/04 |
|
Black Start
Restoration Procedures & Drill |
Project
Management,
Revise Operating Procedures,
Train Plant & System Operators,
Conduct a District-Wide Restoration Drill |
Sacramento
Municipal Utility District
Sacramento, CA &
various out of state locations |
1/00 |
|
Drafting
|
Telecommunications
CAD support
(subcontracted with Allstar Telcom) |
Sacramento
Municipal Utility District
Sacramento, CA |
4/00 |
|
Hydro-Generation
DCN Drafting |
Staff Augmentation
support for Y2K compliance. For Hydro-Generation Facilities
|
Sacramento
Municipal Utility District
Sacramento, CA
|
3/00 |
|
Black Start
Transient Analysis |
Electrical system
stability and transient analysis services
(subcontract with PTI) |
Sacramento
Municipal Utility District
Sacramento, CA
|
12/99 |
|
SMUD Y2K Project |
Staff Augmentation
support for Y2K compliance.
* IT Support
* Operations Equipment Reviews |
Sacramento
Municipal Utility District
Sacramento, CA |
8/99 |
|
Sierra Nuclear /
BNFL, Configuration Management |
Phase I - Review
BFS document control processes and make process improvement
recommendations prior to NUPIC audit.
Phase II - TBD (not required)
Phase III - TBD (not required) |
BNFL Fuel
Solutions,
Scotts Valley, CA |
4/99 |
|
Technical Writing |
Staff Augmentation
for electrical Transmission / Distribution group. |
Pacific Gas &
Electric Co.
San Francisco, CA |
8/00 |
|
Y2K Project PG&E,
Configuration Management |
Elect.
Transmission, Gas Transmission, Power Generation |
Pacific Gas &
Electric Co. |
5/99 |
|
LDBAP Close out /
Altran |
Completion of the
Licensing & Design Basis Affirmation Project documentation closeout. |
Pacific Gas &
Electric Co. |
1/99 |
|
DCPP Y2K peer
audit support (Comanche Peak) |
Represent DCPP in
support of a peer review Y2K audit at the Comanche Peak Power
Station. |
DCPP, CA
Comanche Peak Power Station, TX |
2/99 |
|
Y2K PG&E Company,
Electric Transmission |
Conduct due
diligence documentation and assessment in accordance with PG&E's
Year 2000 Project Plan for Electric Transmission |
Pacific Gas &
Electric Co.
San Francisco, CA |
5/99 |
|
Y2K WNP-2 Audit |
Conducted/Supported Y2K Program external short term audit.
Follow-up Review |
Washington Public
Power Supply Systems,
Richland, WA |
10/98
4/99 |
|
Advance System
upgrade to 32-bit system |
Manage the
development and implementation of the Advance System (electronic
drawing management system) 32 bit upgrade requirements, provide
interface between Plant personnel & programming, perform system
testing, and manage implementation. |
Pacific Gas &
Electric Co.
DCPP, Avila
Beach, CA / San Ramon, CA |
8/99 |
|
Y2K DCPP Component
Assessment |
Develop a
component list to be considered for Year 2000 susceptibility and
perform an initial assessment of that component list. Continued with
Detailed assessment of identified components and system impact to
plant operation. |
Pacific Gas &
Electric Co.
San Francisco,
CA /
DCPP, Avila Beach, CA |
12/99 |
|
LAR - ECG DCM
Revisions |
Review Licensing
submittals, evaluate the impact on the Design Basis (Design Criteria
Memorandums-DCM) , and perform the revision to the DCMs. |
Pacific Gas &
Electric Co.
San Ramon, CA |
8/98 |
|
Twenty Four (24)
Month Fuel Cycle Calculations |
Provide date
verification and support to calculation development for the
evaluation to extend the DCPP fuel cycle to a 24 month period.
(Follow-up Project) |
Pacific Gas &
Electric Co.
San Francisco,
CA |
4/98 |
|
Electrical Design
Basis Support (98) |
Provides for the
completion of various defined scope tasks to reduce backlog and
enhance the transfer of knowledge to DCPP. Task included but not
limited to DCM and FSAR review and revisions, revision of
calculations, documentation of seismic qualification of electrical
components, and responding to specific action requests. |
Pacific Gas &
Electric Co.
San Francisco,
CA |
6/99 |
|
Configuration
Management Support (98) |
Provide
configuration management, engineering, licensing, & related
engineering services on a task project basis. Tasks include, but are
not limited to support of DCPP Configuration Management Programs and
management of the development and implementation of the Advance
Drawing Process software system. This scope includes knowledge
transfer for the DCM process and the Advance workflow system. |
Pacific Gas &
Electric Co.
San Francisco,
CA |
10/98 |
|
LDBAP Phase II
Management (98) |
Project Management
support for the DCPP Design Basis Configuration Management
Affirmation Project Follow-on Activities in response to NRC request
pursuant to 10CFR50.54(f). This includes management of the
completion of the Phase II Licensing and Design Basis document
reviews. |
Pacific Gas &
Electric Co.
San Francisco,
CA |
11/98 |
|
Bechtel - Energy
Marketing |
Support services
to assist in the development of business plan, marketing research,
strategic direction, and other related tasks for Energy Marketing
Program |
Bechtel National
Inc.
San Francisco, CA |
12/97 |
|
DCP (24 month
cycle) |
Support the
development of the design change package to extend fuel cycle to a
24 month cycle. |
Pacific Gas &
Electric Co.
San Francisco,
CA |
10/97 |
|
Set Point
Calculations (24 month cycle) |
Perform I&C
Setpoint Calculations to support design change to extend fuel cycle
to a 24 month cycle. |
Pacific Gas &
Electric Co.
San Ramon, CA |
10/97 |
|
Short Term - DCM
Open ARs |
Management and
close-out of Design Criteria Memorandum (DCM) Action Plan Short Term
items - Multi discipline design basis open items. |
Pacific Gas &
Electric Co.
San Ramon, CA |
3/98 |
|
Electrical Design
Basis Support |
Continued support
services for Electrical Design Basis Documents. |
Pacific Gas &
Electric Co.
San Francisco,
CA |
12/97 |
|
Project Management
of 50.54f activity |
Project Management
support for the DCPP Design Basis Configuration Management
Affirmation Project Follow-on Activities in response to NRC request
pursuant to 10CFR50.54(f). |
Pacific Gas &
Electric Co.
San Francisco,
CA |
12/97 |
|
Configuration
Management & Engineering |
Provide
configuration management, engineering, licensing, & related
engineering services on a task project basis. Tasks include, but are
not limited to support of DCPP Configuration Management Programs and
Management of the development and implementation o the Advance
Drawing Process software system. |
Pacific Gas &
Electric Co.
San Ramon &
San Francisco, CA |
12/97 |
|
DCM S/MRR Section
5.0 Development |
Develop Section
5.0 Surveillance/Maintenance Requirements Review (S/MRR) for 12 DCM
and resolve open issues related to the S/MRRs of existing DCM
sections. Design Basis information for disciplines including
Mechanical Systems, Electrical Systems, Instrumentation Systems, and
other topics. |
Pacific Gas &
Electric Co.
San Ramon, CA |
7/97 |
|
DCM Open Item
Review |
Perform a review
of Design Criteria Memorandum (DCM) Open Items evaluate
significance, develop Action Plan for closure of Open Items,
including a schedule. |
Pacific Gas &
Electric Co.
San Ramon &
San Francisco, CA |
1/97 |
|
FSAR issues
Electrical Cables & Separation Criteria for Class 1E Systems (Tie
Wraps & Reg. Guide 1.75) |
Develop a PG&E
position document for Tie Wraps and Regulator Guide issues, as it
relates to facility design. Close quality evaluation documents and
revise Design Basis Documents (DCMs) as necessary. |
Pacific Gas &
Electric Co.
San Francisco,
CA |
7/97 |
|
a) Re-write Design
Criteria Memorandum (DCM) for DCPP "500kV and 230kV Systems"
document S-61B.
b) CFR50.54f White Paper |
a) Update,
re-write, and revise DCPP Design Basis document DCM S-61B to ensure
technical correctness, and incorporate design changes to the system.
b) Develop 500kV & 230kV white paper to support response for NRC
CFR50.54f letter. |
Pacific Gas &
Electric Co.
San Francisco,
CA |
3/97
1/97 |
|
Technical Support
Services for NRC CFR50.54f issues. |
Assist in the
development of regulator response to the NRC regarding CFR 50.54F
issues. To ensure NRC regulatory requirements are meet as required
for design basis issues. |
Pacific Gas &
Electric Co.
San Francisco,
CA |
2/97 |
|
Engineering
evaluation of non-Class 1E circuit breaker penetrations. |
Perform Electrical
Engineering evaluation of non-Class 1E circuit breaker penetrations
at DCPP.. |
Pacific Gas &
Electric Co.
San Ramon &
San Francisco, CA |
10/96 |
|
1996 DCPP Final
Safety Analysis Report (FSAR) update. |
Assist in the DCPP
FSAR Update. Review & consolidate revisions to the FSAR for the
Electrical Engineering Department. |
Pacific Gas &
Electric Co.
San Ramon &
San Francisco, CA |
9/96 |
|
DCPP Design Basis
Memorandums revision (80 plus documents) |
Ensure technical
correctness & perform revisions of the power plants design basis
documents (Mechanical, Electrical, Instrumentation, Civil,
Structural, & Waste Management Systems). |
Pacific Gas &
Electric Co.
San Ramon &
San Francisco, CA |
8/96 |
|
Technical Support
Services & Configuration Management |
Provide System
Engineering & Configuration Management for Diablo Canyon Power Plant
(DCPP). (Staff augmentation to PG&E) |
Pacific Gas &
Electric Co.
San Francisco,
CA |
12/96 |